Gustavo Fricke Hospital, Chile
Development of a building management system “BMS” the Chilean Dr. Gustavo Fricke de Viña del Mar hospital.
AG Solution was commissioned to supply, install and roll out the building management system (BMS) of the new Dr. Gustavo Fricke de Viña del Mar hospital in Chile.
Development of a building management system “BMS” the Chilean Dr. Gustavo Fricke de Viña del Mar hospital
Development of a building management system “BMS” the Chilean Dr. Gustavo Fricke de Viña del Mar hospital:
AG Solution was commissioned to supply, install and roll out the building management system (BMS) of the new Dr. Gustavo Fricke de Viña del Mar hospital in Chile.
The BMS includes control and/or monitoring of the following aspects:
Air conditioning
Lighting in common areas
Energy supply and control of demand for electricity
Sanitation facilities (drinking water – waste water)
Fuel tank levels
Reading meters for cost management with energy management and energy demand control.
Dry contact system integration in the Control Centre:
Clinical Gas Alarms – Via Dry Contact and Cost Management
Pneumatic Delivery Alarm – Via Dry Contact in Control Room
Integration of the control solutions with BMS’ SCADA software for operating systems with the following features:
Digital video system
Access Control System
Fire Detection
Vertical transportation
Transformer monitoring and meter reading for cost management
Generator monitoring via Modbus (Modbus RTU or Modbus TCP)
UPS – Monitoring via Modbus communication protocol (Modbus RTU or Modbus TCP)
Execution of the networks for data buses and structured wiring of LAN network designed in the BMS Project for operating the system